Construction is continuing at a fast pace! The concrete ramp connecting the youth hallway to the Discovery Zone has been poured. Old doorways for classrooms and bathrooms have been closed up, and new doors have been installed.
Contractors are planning to have bathroom access in the Discovery Zone available by the end of this week.
New railings for the ramp are still to be installed, as well as a new placement of the door separating the two areas.
Additionally, construction has begun on the elevator shaft!